Single glazed 12mm frameless glass partitioning. Installed to the 3rd-floor level. Incorporating white (RAL 9010) slimline frameless glass system and dividing 75mm solid stud partitions. Including  3 frameless double glass doors, which incorporated free swing floor pivots and our signature return lever handle. Our electrical fit-out team in attendance to relocate lighting, power sockets, floor boxes and data cabling, as well as install new AV feature wall.

 

Duration of the project: 2.5 weeks from our customer's order

Size of the office: x2 offices and a new boardroom

Value of the project: £12,400.00 +vat