top of page

Removal of the existing solid partition divide between the Mezz office space and the lower level workshop. Supply & install new Single glazed acoustic frameless glass partitioning to allow natural light into the offices above, whilst preventing the sound transfer from the lower level workshop. Incorporating our slimline frameless glass system.  Finished with 2 rows of 50mm diameter Opal frost circles.

 

Duration of the project: 1 week from our customer's order

Size of the office: 7100mm width

Value of the project: £3,500.00 +vat

dB rating: 35db lab tested

 

 

Coiled spring- Twickenham

PREMFIX INTERIORS LONDON LTD

6b Porters Wood, St Albans, Hertfordshire AL3 6PA

Email: hello@premfixinteriors.com, Phone 01462 622645

© Copyright 2024 Premfix Interiors Ltd, all rights reserved

bottom of page